Bladen Bluffs Regional Surface Water Treatment Plant

Tar Heel, North Carolina

Construction of a new 4 million gallon per day water treatment plant, including a raw water intake and pump station at the Cape Fear River, 42” microtunnel into the Cape Fear River, 3200 lineal feet of 24” raw water pipeline, a finished water pipeline, filters, flocculation and sedimentation tanks, Administration Building, Chemical Feed Building, reclamation ponds and all associated sitework, pipe, fittings, valves, electrical, process equipment and SCADA system.

Lower Cape Fear Water and Sewer Authority

Camp, Dresser, and McKee

$24,160,725

January 4, 2010

July 1, 2012

Emergency Trunk Repair From RM Clayton WRF to Bohler Road

Atlanta, Georgia

Installation and rehabilitation, utilizing an 84" internal liner, of approximately 2,500 lf total of the 90" Peachtree Trunk that have little-to-no soil overburden. Work included laser profiling of the host pipe to determine the inside dimensions, cleaning the pipe to allow for the liner, by-passing the flow, installing the profile material, and grouting the annular space.

City of Atlanta Department of Watershed Management

Brown and Caldwell

$5,100,000

September 1, 2009

September 1, 2010

Leesburg WWTP

Leesburg, Georgia

The construction of a new Wastewater Treatment Plant including new headworks, oxidation ditch, clarifiers, UV and cascade structure, other structures, RAS/WAS and other incidental pump stations, digester, dewatering and maintenance facilities, blowers, chemical feed, lab/administration building, process piping, outfall sewer and access road with all related accessories.

City of Leesburg

Stevenson and Palmer Engineers

$5,191,442

October 1, 2010