The project consists of the construction of a new 4.0 MGD Wastewater Reclamation Facility (WRF) at the site of the existing Travis Field WRF. The scope for this project included: headwork's facility, including mechanical screening, grit removal system, associated piping and controls, EQ tanks, mixing system and EQ pump station, anaerobic, pre-anoxic, pre-aeration, post anoxic, and membrane thickening basins including submersible mixer{s), diffused aeration system, blowers, and recycle pumps/wet well, membrane bioreactor {MBR) basins and covered equipment area, a two-story building to provide the following: blowers, pumps and other equipment., storage and feed for sodium hydro chlorite, caustic soda, etc., control room, associated casework and equipment, electrical/MCC Room, associated equipment, mechanical room, associated equipment, store room, bath room and shower, monorail beam and hoist system for MBR filters, flow monitoring, screenings dumpsters and slab for screenings and grit, MBR filter wash pad on grade, screening structure, plant drain pump station, two diesel engine generators with fuel tank, mechanical and electrical accessories and access walkway, associated instrumentation and control equipment, associated communications system including programmable logic, controller {PLC), Input/output {1/0) modules and scada, associated electrical equipment and work, associated grounding and lightning protection systems, site and facility lighting, chemical storage and delivery system, water supply line, sludge dewatering system, UV system, electrical, control, conduit, wiring, etc., plant fencing, MBR membranes, equipment and related.
City of Savannah
Thomas and Hutton
$39,355,812
November 2019
February 2022