Lake Keowee Intake-Adkins WTP Raw Water System

Greenville, South Carolina

Greenville water has identified the need to replace two 48” PCCP raw water lines running from the raw water pump station to the gate to the pump station access road. At two locations, fittings, valves, vaults, piping and other appurtenances will be installed to provide interconnections between the parallel raw water mains.

The purpose of this project is to mitigate the risk of failure of the existing PCCP lines, and increasing capacity by replacing them with 4,000 linear feet of 54” steel pipe. The interconnections serve to maintain maximum available capacity in the event one of the parallel mains is out of operation.

Greenville Water

Brown and Caldwell

$6,753,905

April 2023