This project in Clayton County, Georgia required extensive bypass pumping to install approximately 6,600 feet of 18” PVC gravity sewer via open cut. The project included various terrain from road crossings to street work, backyard installation and work in the right of way. Multiple bypass systems were used to facilitate connections to side line tie ins and service connections. New pipe was installed in the same trench as the existing pipe was removed and consisted of approximately 56 service reconnections. The project was completed in January 2022.
Clayton County Water Authority
Clayton County Water Authority
$2,660,193.75
January 2022