Georgia Power Peachtree Substation
Atlanta, Georgia
This project includes the re-routing of a 54" sewer trunk line at a Georgia Power Substation facility.
• 500 LF of 54" Concrete Pipe
• 100 LF of 84" Hand-Mined Tunnel
• Two cast-in-place concrete junction boxes
• Grout fill abandonment of existing pipe
• Sewer flow diversion
• Asphalt restoration
Georgia Power
Long Engineering
$1,934,815
October 1, 2018
February 1, 2019