Projects

30″ Force Main Replacement (Phase V)

Myrtle Beach, South Carolina

This project consisted of installing approximately one mile of 36" DIP sewer force main with fittings and accessories. A portion of the pipe was installed in the grass median of U.S. Hwy 17 Bypass, but the majority of it was installed In the inner southbound lane extending all the way into the intersection of U.S. Hwy 17 Bypass and Chestnut Road. The project also consisted of milling and resurfacing, valves replacement, bypass pumping, line stop installations, utility cut patching, pavement marking, traffic control, traffic sign installation and seeding.

The City of Myrtle Beach

The City of Myrtle Beach Public Works Department

$2,897,331

January 15, 2014

June 1, 2014

Fowler Water Reclamation Facility

Forsyth County, Georgia

Design/Build/Operate of a new Water Reclamation Facility consisting of clearing, excavation, construction of influent pump station, screening system, membrane filtration system, digesters, lined 6 MG pond, 6 MG pre-stressed concrete storage tank, all equipment and piping, entrance road, yard piping, storm drainage and backfill, grading and grassing.

Forsyth County

Metcalf and Eddy, Inc.

$14,552,938

January 2003

July 2004

Additions to Shoal Creek WPCP

Clayton County, Georgia

2.2 MGD Water Pollution Control Plant, including all site work; total poured in place concrete (approximately 10,921 cy) new raw wastewater pump station, influent flow measurement structure, fine screen structure, aerated grit and grease structure, influent splitter box and RAS pump structures, aeration basin structure, WAS pump station, chemical feed building, two new aerobic digester/thickener, ultraviolet disaffection structure, transfer pump station, thickened sludge pump station, disinfection system, and 36” storm sewer piping for Reclaimed Water Facility.

Clayton County Water Authority

Robert and Company

$14,633,973

March 12, 2000

November 1, 2002