Projects

Emergency Trunk Repair From RM Clayton WRF to Bohler Road

Atlanta, Georgia

Installation and rehabilitation, utilizing an 84" internal liner, of approximately 2,500 lf total of the 90" Peachtree Trunk that have little-to-no soil overburden. Work included laser profiling of the host pipe to determine the inside dimensions, cleaning the pipe to allow for the liner, by-passing the flow, installing the profile material, and grouting the annular space.

City of Atlanta Department of Watershed Management

Brown and Caldwell

$5,100,000

September 1, 2009

September 1, 2010

30″ Force Main Replacement (Phase V)

Myrtle Beach, South Carolina

This project consisted of installing approximately one mile of 36" DIP sewer force main with fittings and accessories. A portion of the pipe was installed in the grass median of U.S. Hwy 17 Bypass, but the majority of it was installed In the inner southbound lane extending all the way into the intersection of U.S. Hwy 17 Bypass and Chestnut Road. The project also consisted of milling and resurfacing, valves replacement, bypass pumping, line stop installations, utility cut patching, pavement marking, traffic control, traffic sign installation and seeding.

The City of Myrtle Beach

The City of Myrtle Beach Public Works Department

$2,897,331

January 15, 2014

June 1, 2014