Goodrich Street RWPS Improvements

Augusta, Georgia

Construction of two concrete channels, bar screens, rakes, intake gates, flood gates, power chest housing, 4,000 horsepower water driven turbine, pump room and administration building.

Project also included: site improvements and modifications to existing raw water intake, selective demolition of existing concrete structures and buildings, concrete water retaining structures, high service pumping station utilized to convey water from finished water storage to distribution system, modifications to existing yard piping, electrical work associated with raw water intake and WTP.

Augusta Utilities Department

ZEL Engineers

$11,309,141

July 27, 2015

September 28, 2018

Clemson University WWTF Upgrade

Clemson, South Carolina

Upgrade of 1.8 MGD Wastewater Treatment Plant including a new Headworks with Fine Screen and Grit Removal, new Submersible Influent Pump Station, with Electrical Building and Standby Generator. Work also includes retrofit of two existing Clarifiers and 1600 lineal feet of 16” DIP Forcemain.

Clemson University

Design South Professionals, Inc.

$3,843,000

March 26, 2014

July 13, 2015

Forest Trails WWTP Replacement

Isle of Palms, South Carolina

A new treatment facility was designed by Thomas & Hutton to replace the aged steel-package system at the Isle of Palms Water & Sewer Commisson Forest Trails Wastewater Treatment Plant site. A review of various treatment alternatives ensued, including contact stabilization, oxidation ditch, traditional fine bubble activated sludge, sequencing biologic reactors (SBR), and membrane bioreactors (MBR). Due to space constraints, and superior treatment, the MBR process was chosen using a Business Cast Evaluation process which considered monetary and non-monetary factors.

Isle of Palms Water and Sewer Commission

Thomas and Hutton Engineering Company

$6,367,000

July 2014

July 2015