Projects

Richland Creek Trunk Sewer Replacement

Greenville, South Carolina

Replacement of 15,000 LF of ductile iron pipe ranging from 24" to 42" in diameter. Four major jack and bore crossings, several creek crossings, blasting, major bypass pumping of existing sewer mains.

Renewable Water Resources

Brown and Caldwell

$12,684,179

September 22, 2016

February 2018

Highway 41 Water Main Phase IV

Cobb County, Georgia

Installation of approximately 15,700 lineal feet of Ductile Iron Pipe. Average depth of the pipe was 15 feet. Work was performed mostly In a 4 lane GDOT highway. Project also included a hand-mined 84" tunnel.

Cobb County Marietta Water Authority

Atkins

$13,655,964

July 2015

April 2017

Wells Crossroads to Holly Hill Reach Water Transmission Main

Holly Hill, South Carolina

This project consists of installing approximately 38,000 lf of new 24” and 12” ductile iron water transmission main piping. This project also includes approximately 950 lf of 24” Horizontal Directional Drilling and approximately 700 lf of 36” Jack and Bores.

Santee Cooper

Hazen and Sawyer

$4,796,500

October 1, 2012

October 1, 2013