Clemson University WWTF Upgrade

Clemson, South Carolina

Upgrade of 1.8 MGD Wastewater Treatment Plant including a new Headworks with Fine Screen and Grit Removal, new Submersible Influent Pump Station, with Electrical Building and Standby Generator. Work also includes retrofit of two existing Clarifiers and 1600 lineal feet of 16” DIP Forcemain.

Clemson University

Design South Professionals, Inc.

$3,843,000

March 26, 2014

July 13, 2015

Forest Trails WWTP Replacement

Isle of Palms, South Carolina

A new treatment facility was designed by Thomas & Hutton to replace the aged steel-package system at the Isle of Palms Water & Sewer Commisson Forest Trails Wastewater Treatment Plant site. A review of various treatment alternatives ensued, including contact stabilization, oxidation ditch, traditional fine bubble activated sludge, sequencing biologic reactors (SBR), and membrane bioreactors (MBR). Due to space constraints, and superior treatment, the MBR process was chosen using a Business Cast Evaluation process which considered monetary and non-monetary factors.

Isle of Palms Water and Sewer Commission

Thomas and Hutton Engineering Company

$6,367,000

July 2014

July 2015

Bladen Bluffs Regional Surface Water Treatment Plant

Tar Heel, North Carolina

Construction of a new 4 million gallon per day water treatment plant, including a raw water intake and pump station at the Cape Fear River, 42” microtunnel into the Cape Fear River, 3200 lineal feet of 24” raw water pipeline, a finished water pipeline, filters, flocculation and sedimentation tanks, Administration Building, Chemical Feed Building, reclamation ponds and all associated sitework, pipe, fittings, valves, electrical, process equipment and SCADA system.

Lower Cape Fear Water and Sewer Authority

Camp, Dresser, and McKee

$24,160,725

January 4, 2010

July 1, 2012