Pump Stations

Hartsfield Jackson Manifold Improvements

Atlanta, Georgia

The Project primarily involves replacing the discharge manifold piping, valves, and fittings, as well as other piping, valves, and fittings at the Hartsfield-Jackson Atlanta International Airport Pump Station.

The Work includes, but is not limited to site investigation and mitigation; demolition of existing ductile iron pipe, fittings, and valves; installation of new flow meters; construction of reinforced concrete foundation slabs; structural and architectural modifications to the existing pump station building to facilitate the new above grade piping; temporary bypass piping; dewatering; electrical and controls; storm drainage; green infrastructure such as a rain garden or bio-swale, new ornamental fencing, erosion and sediment control.

The project is utilizing the Design-Build (D-B) delivery method.

City of Atlanta

Williams Russell and Johnson

$5,459,032

May 5, 2018

June 1, 2019