Hartsfield Jackson Manifold Improvements
Atlanta, Georgia
The Project primarily involves replacing the discharge manifold piping, valves, and fittings, as well as other piping, valves, and fittings at the Hartsfield-Jackson Atlanta International Airport Pump Station.
The Work includes, but is not limited to site investigation and mitigation; demolition of existing ductile iron pipe, fittings, and valves; installation of new flow meters; construction of reinforced concrete foundation slabs; structural and architectural modifications to the existing pump station building to facilitate the new above grade piping; temporary bypass piping; dewatering; electrical and controls; storm drainage; green infrastructure such as a rain garden or bio-swale, new ornamental fencing, erosion and sediment control.
The project is utilizing the Design-Build (D-B) delivery method.
City of Atlanta
Williams Russell and Johnson
$5,459,032
May 5, 2018
June 1, 2019