Projects
Ruby-Collins, Inc
has performed
General Construction projects of sizes ranging from $150,000 to $101
Million. These projects were
performed as a General Contractor, a Subcontractor, a Construction Manager
and a Design/Build Contractor.
Our main line of services is Heavy and Municipal type projects,
below is a listing of the various type projects Ruby-Collins performs.
- Wastewater
Treatment Plants
- Water
Treatment Plants
- Sanitary
Sewer Lines
- Force Mains
|
-
Utilities (Large Diameter)
- Box
Culverts
- Pump
Stations
- Public Transit
Stations
|
|
Most Recent Projects
BLADEN BLUFFS REGIONAL SURFACE WATER TREATMENT PLANT
|
Tarheel, NC
|
|
|
Owner:
|
Lower Cape Fear Water & Sewer Authority
|
|
Engineer:
|
Camp Dresser & McKee
|
|
Contract Amount:
|
$25,530,000.00
|
|
Time:
|
820 days
|
|
Notice of Award:
|
Dec 20, 2009
|
|

|
|
The construction
of a new 4 million gallon per day water treatment plant, including a
raw water intake and pump station at the Cape Fear River, a raw
water pipeline, a finished water pipeline, filters, flocculation and
sedimentation tanks, Administration Building, Chemical Feed
Building, reclamation ponds and all associated sitework, pipe,
fittings, valves, electrical, process equipment and SCADA system.
|
|
|
|
|
|