Current Projects

INDIAN CREEK COMPLETION PROJECT

Atlanta, GA

 

Owner:

City of Atlanta

Engineer:

Benchmark Management

Contract Amount:

$2,950,000.00 

Time:

505 days

Notice of Award:

Nov 2010

This project consists of re-work associated with a 96” tunnel that contains a 36” carrier pipe.  The carrier pipe needs to be re-established to the proper line and grade.  This project includes shaft excavation, tunneling, grouting and backfilling.

Lake julian interceptor phase iii

Buncombe County, NC

Plans & Specs

Owner:

Metropolitan Sewer District of Buncombe County, NC

Engineer:

MSD of Buncombe County, NC

Contract Amount:

$2,905,408.50 

Time:

365 days

NTP:

Oct 28, 2010

This project is a gravity sewer outfall that consists of 8,175 lf of open-cut ductile iron piping ranging from 36” to 8” as well as 500 lf of Jack & Bore.  Activities on this project include clearing, erosion control, aerial crossings, open-cut piping, jack & bore and manhole installation.

BLADEN BLUFFS REGIONAL SURFACE WATER TREATMENT PLANT

Tarheel, NC

Plans & Specs

Owner:

Lower Cape Fear Water & Sewer Authority

Engineer:

Camp Dresser & McKee

Contract Amount:

$25,530,000.00 

Time:

820 days

Notice of Award:

Dec 20, 2009

The construction of of a new 4 million gallon per day water treatment plant, including a raw water intake and pump station at the Cape Fear River, a raw water pipeline, a finished water pipeline, filters, flocculation and sedimentation tanks, Administration Building, Chemical Feed Building, reclamation ponds and all associated sitework, pipe, fittings, valves, electrical, process equipment and SCADA system.