Joint Venture with Alberici as Subcontractor to Gunther-Nash on a
$37 Million CSO Storage & Dechlorination Facility Upgrade for the
City of Atlanta. Ruby-Collins, Inc work includes construction
of concrete structures, process equipment installation and piping
systems. (Ruby-Collins, Inc also is a subcontractor to the
joint venture – subcontract amount $2,134,550.)
GENEROSTEE CREEK WWTP EXPANSION
|
Anderson, SC
|
|
|
Owner:
|
City of Anderson
|
|
Engineer:
|
Design South Professionals, Inc.
|
|
Contract Amount:
|
$16,116,941.74
|
|
Time:
|
760 days
|
|
Completed:
|
December 2006
|
|

|
|
Major expansion of an existing wastewater treatment plant
involving the addition of a 3.8 MGD treatment train, which will
increase the plant capacity to 10 MGD. Construction of a
Primary Clarifier, First Stage Trickling Filter, Intermediate
Clarifier, Second Stage Trickling Filter, Final Clarifier,
Recirculation/Sludge Pump Building, Chlorine Contact Tanks, Digester
Complex with two new Digesters and a Digester Pump Room, Magnesium
Hydroxide Feed Building, Roll-off Container Building, Generators,
Instrumentation and Controls, related process piping and equipment,
and site work as well as an upgrade to some of the existing
equipment, modifications to existing facilities, and instrumentation
and controls.
|
|
|
|
ALCOVY RIVER INTAKE AND PUMPING STATION
|
Newton County, GA
|
|
|
Owner:
|
Newton County Board of Commissioners
|
|
Engineer:
|
Infratec Consultants, Inc.
|
|
Contract Amount:
|
$1,569,224.00
|
|
Time:
|
425 days
|
|
Completed:
|
August 2005
|
|

|
|
Construction of a new Raw Water Intake & Raw Water
Pump Station
Building, Pumps, Piping,
36” DIP Force Main and Sitework.
|
LAKESIDE PUMP STATIONS. FORCE MAINS & GRAVITY SEWERS
|
Greenville, SC
|
|
|
Owner:
|
Western Carolina Regional Sewer Authority
|
|
Engineer:
|
Jordan Jones, & Goulding, Inc.
|
|
Contract Amount:
|
$4,784,881.00
|
|
Time:
|
270 days
|
|
Completed:
|
August 2004
|
|

|
|
Construction of two wastewater pump stations with self-priming
centrifugal pumps; a mechanical bar screen structure; approximately
4,400 feet of 16-inch and 500 feet of 24-inch ductile iron pipe
gravity sewer; approximately 15,000 feet of 18-inch and 8,000 feet
of 20-inch ductile iron pipe force main; approximately 24 manholes,
20 air release valves; erosion and sedimentation control and
associated appurtenances.
|
|
|
|
FoWLER Water Reclamation Facility
|
Forsyth County, GA
|
|
|
Owner:
|
Forsyth County
|
|
Engineer:
|
Metcalf & Eddy
|
|
Contract Amount:
|
$14,984,922.00
|
|
Time:
|
days
|
|
Completed:
|
July 2004
|
|

|
|
Design/Build/Operate of a new Water Reclamation
Facility consisting of clearing, excavation, construction of
influent pump station, screening system, membrane filtration system,
digesters, lined 6 MG pond, 6 MG pre-stressed concrete storage tank,
all equipment and piping, entrance road, yard piping, storm drainage
and backfill, grading and grassing.
Middle Oconee Pumping Station and Force Main
|
Jackson County, GA
|
|
|
Owner:
|
Jackson County Water Authority
|
|
Engineer:
|
|
|
Contract Amount:
|
$1,321,347.00
|
|
Time:
|
days
|
|
Completed:
|
July 2004
|
|

|
|
Construction of approximately 4,500 linear feet of 12 inch
through 20 inch ductile iron force main, pumping station with
submersible pumps, wet well and valve chamber.
Work also includes one jack and bore crossing under State
Highway 11 and one crossing of the
Middle
Oconee River.
Georges Creek Regional WWTP
|
Greenville, SC
|
|
|
Owner:
|
Western Carolina Regional Sewer Authority
|
|
Engineer:
|
Jordan Jones, & Goulding, Inc.
|
|
Contract Amount:
|
$17,533,335.00
|
|
Time:
|
730 days
|
|
Completed:
|
November 2003
|
|

|
|
Construction of a new 3 MGD wastewater treatment plant consisting
of clearing, excavation, construction of influent wet/dry pump
station, preliminary treatment structure, oxidation ditches (2),
clarifiers (2), chlorine contact tank, RAS/was pump station, gravity
thickener, utility water tank, aerobic digesters(2), biosolids
building, chemical building., miscellaneous, structures, emergency
pond and all equipment and piping within and a new entrance road,
new yard piping, storm drainage and backfill, grading and grassing.
ADDITIONS TO SHOAL CREEK WPCP
|
Clayton County, GA
|
|
|
Owner:
|
Clayton County Water Authority
|
|
Engineer:
|
Robert and Company
|
|
Contract Amount:
|
$14,633,973.00
|
|
Time:
|
670 days
|
|
Completed:
|
November 2002
|
|

|
|
2.2 MGD Water Pollution
Control Plant, including all site work; total poured in place
concrete (approximately 10921 cy) new raw wastewater pump station,
influent flow measurement structure, fine screen structure, aerated
grit and grease structure, influent splitter box and RAS pump
structures, aeration basin structure, WAS pump station, chemical
feed building, two new aerobic digester/thickener, ultraviolet
disaffection structure, transfer pump station, thickened sludge pump
station, disinfection system, and 36” storm sewer piping for
Reclaimed Water Facility.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|